Designed by WMK Architecture, this project was committed to architectural innovation, and a commitment to preserving the building’s original integrity.

One of the project’s standout features was the construction of a mezzanine level, which included a great space with 30-meter-high ceiling, where works were completed on within a live environment.
This required planning and coordination to minimise disruptions to ongoing operations while working towards a tight programme.

The project demonstrated excellent collaboration between trades with attention to detail on elements that focused on a selection of finishes, successful management of a live environment, and a commitment to preserving the integrity of the building. A testament to the team’s ability to transform a space into a dynamic and functional workspace.