McCormack undertook a comprehensive DCI & ECI project to enhance and reposition A grade building 412 St Kilda Road, a 11,321m2, 18-floor commercial landmark. Collaborating with top-tier designers and engineers, the project is positioned in the perfect location with captivating views of the Shrine of Remembrance and botanical gardens whilst being a brisk walk to Southbank.

McCormack’s focus is on enhancing the property’s value through turnkey fitouts, exterior refurbishments, and spec fitouts, alongside the introduction of a cafe centered in as boutique business hub, offering a versatile, inviting environment for work and leisure.

 

Façade Remedial Works (Restoration & Painting)
Level 6 Demolition & Intertenancy Works
Level 7, 8 & 9 Warm Shell & Intertenancy Works
Level 13 Demolition & Intertenancy Works
Level 14 Demolition & Intertenancy Works
Level 15 Demolition & Intertenancy Works

Ground Floor Café & Business Hub Fitout

 

Turnkey


Level 4 – Workplace Fitout, Upco (399m2)

Level 6 – Turnkey Fitout, Fisher (404m2)

 

Level 6 – Turnkey Fitout, Heron (185m2)

    

Level 8 – Workplace Fitout, ADP

Level 13 – Turnkey Fitout, VCON (715m2)

 

Level 13 – Turnkey Fitout, Vision Eye (420m2)

   

Level 14 – Workplace Fitout, Koustas & Co (620m2)

 

Level 15 – Workplace Fitout, Dobbyn & Carafa (715m2)

Level 16 – Workplace Fitout, Adica (1130m2)

Level 6, 8, 9 & 13 – Tenancy Alterations

– Level 7, Level 8, Level 9, Spec Suite Fitouts (7 Total 3,450m2)

      

      

– Level 14 – Spec Suite Fitout (500m2)